SHINESTAR STEEL GROUP CO., LTD

盛仕达钢铁股份有限公司

The difference between stainless steel pipe and stainless steel pipe fittings

1. Different production methods.

Non-steel products have no fixed style and specifications, and are generally custom-made stainless steel pipes to cater to customers’ stainless steel products. Therefore, the production method is not fixed, and everything is subject to the customer’s production requirements. Stainless steel pipe production methods are divided into two types, one is standard parts, which are generally used for connection, control, reversing, shunt, sealing, support and other functions. . The other is customized parts, which are stainless steel pipe fittings that are deep-processed from stainless steel pipes according to the processing needs of customers. In this way, there is no fixed production method that needs to be customized according to demand like product tubes.

2. The quality requirements are different.

The quality requirements of stainless steel pipes are higher than those of stainless steel pipe fittings. Stainless steel pipes have very strict requirements on material materials, dimensional accuracy, surface treatment, and mechanical properties. Generally, 304 and 316 are mainly selected for materials. The quality requirements for stainless steel pipes are not high, and they are generally standard parts. All quality requirements are not strict. The selection of materials is also varied, you can choose 201, 304, 316 and so on.

3, the applicable methods are different.

Stainless steel pipes have a wide range of applications, generally semi-finished pipes, and later processing such as flaring, pipe bending, cutting, drilling, etc., are more commonly used in bathrooms, mechanical structures, food, fluid pipes, etc. The application method is limited to stainless steel pipe fittings in connection, control, direction change, diversion, sealing, support, etc., which are generally finished products and do not require post-processing. Actions commonly used to connect systems and parts.


Post time: Jun-28-2022