Pipeline construction is a process handled by a very large professional team, and they use their expertise to coordinate operations in a seamless and organized manner.
Things to prepare before construction
Interact with landowners and stakeholders.
This process may take months or even years and requires coordination with landowners and stakeholders to ensure that they understand the construction schedule and details.
Survey and stake out
Survey and review the full length of the proposed pipeline to ensure the right of way and establish a temporary working area.
Preparing the right-of-way
Cleaners are dedicated to removing vegetation and buildings in the proposed pipeline area.
Trenching – The machine can create precise trenches whose width and depth are necessary for the type of pipeline being built.
Straighten the tube
Lay pipes of various lengths along the trench. Prioritize strength and safety, including choosing the correct pipe thickness, material type, and required testing.
Post time: Jul-06-2020